COVID-19 Hands-Free Process. Click here to learn more.

Caminodelrio-2

This hotel was a dilapidated mess with interior damage that was so severe the entire building needed to be completely restored. The existing gravel roof caused the roof to sag in numerous places resulting in huge pools of water that increased the weight by thousands of pounds which prematurely deteriorated the roofing membrane resulting in water infiltration and hundreds of thousands of dollars in repairs.

Posted in